Thirteen ready-made Gantt charts, grouped by the kind of project you are planning. Every one is a real, working chart rather than a picture of one: the phases, task durations, dependencies and milestones are already set up, so you can configure how linked tasks respond to date changes. Open a template to see how it is put together, or copy it into your own account and change the dates to yours. All of them are free, and there is nothing to install.
Plans that fit most projects. Start here if none of the industry templates below is a clean match, or if you want the standard shape before adapting it.
The standard five-phase schedule with a baseline milestone and two parallel workstreams. For anyone who needs to run a project from the chart, not just present it.
A small three-phase plan with dependencies and two milestones. For seeing what a Gantt chart looks like with linked tasks and milestones, before building a bigger one.
Milestone-led and deliberately sparse. For reporting progress upwards to a client or a board, where long bars and a few checkpoints read better than task detail.
Three weeks of day-level tasks laid out Monday to Friday. For work measured in days rather than months, such as a sprint or a short client engagement.
Built around the trade sequence, the inspections and the waits you do not control.
For a proposal, a dissertation or a PhD, with time set aside for approvals, writing and feedback.
Plans that work back from a fixed date, where the launch or the event is the one thing that cannot move.
Strategy through to post-mortem, with every asset traced back to the launch date and a QA gate before anything goes live. For campaign managers running content, paid and email against one launch.
Twelve weeks with the go-to-market track running alongside the build, and one launch milestone both tracks feed into. For product and marketing teams launching the same thing on the same day.
Works back from a fixed date, with the venue booking as the hard gate and a wrap-up phase after the event. For conferences, launches and anything else with a date on the invitation.
For builds where the streams overlap and the test plan is written while the code is.
Discovery through beta to launch, with backend and frontend overlapping and the test plan written during the build. For a team that plans in Jira or Asana but needs the whole project, including the non-engineering work, on one chart.
Three programmes on one chart, each with its own phases and dependencies. For seeing where two projects collide over the same people or the same week.
Smaller charts built to demonstrate one thing clearly rather than to run a project from.
A Gantt chart template gives you a starting set of phases, tasks, durations and links. Review that structure against your own work before adding dates. Permits, reviews, deliveries and approvals may need to be added, removed or moved to fit your process.
These templates open as editable charts in the browser. With automatic scheduling configured, linked tasks can shift when dates change. A basic spreadsheet template may need manual updates, while formulas or add-ons can provide scheduling logic. Choose the format you can maintain and share.
A template is useful when its structure resembles your project. It can prompt you to include a review or handoff you might otherwise miss. Check the dependencies as carefully as the task list; a familiar phase name does not mean the sequence is right for your work.
Start with a blank chart when the project needs a different structure. The simple Gantt chart can still help you see how tasks, milestones and dependencies fit together.
Pick a template and open the preview. You will see the whole schedule laid out on a timeline: phases grouped down the left, each task as a bar showing when it starts and how long it runs, and arrows between tasks that have to happen in order. The preview opens without an account.
When you click Use template, a copy is made in your own account and the whole schedule is shifted so it starts on the coming Monday. The gaps between tasks are preserved, so you get a plan that begins now rather than a set of dates from a demo. From there you can drag bars, change durations, add your own tasks, set a baseline once the plan is agreed, and share the chart with a link.
A Gantt chart is only worth building if it tells you something a task list cannot. Three things do that work, and every template here has all three:
If you want the background before you pick one, what is a Gantt chart covers the basics, Gantt chart dependencies explains which tasks are worth linking, and how to create a Gantt chart walks through building one from scratch if none of these fits.